The following recommendations can be made for AC power supply systems for all types of operation (suburban, regional, intercity, freight).

Recommendations for Operational Measures

  • Parked train management is a very promising operational measure with a high saving potential (4-8%) and comparably low investment costs. In mainly focuses on a more efficient load and temperature management for parked trains and can be realized as a first stage by low tech measures. More complex systemic solutions require higher investments and a higher organisational effort because established processes and habits have to be changed.
  • Eco driving (levels 1 and 2 - see "Technology description" for details) is highly promising, like for the other types of power supply. It has a saving potential between 5% and 15% depending on the actual operational regime and on the level of sophistication of the introduced system.
  • Energy efficient traffic management (eco-driving level 3) will allow significant reductions in energy consumption in the railway system (between 10% and 14%). The implementation of such systems requires a high degree of cooperation between the different stakeholders - infrastructure managers, train operating companies, rolling stock and signalling equipment manufacturers and standardisation bodies and safety authorities. The needed joint effort goes clearly beyond the "business as ususal" scenario. A reasonable degree of standardisation is needed in order to guarantee swift progress in this field.

The following figure gives an overview over the qualitative dependence of level of complexity and amortization time for promising operational measures and thus represents an implementation perspective for energy saving measures:


Qualitative dependence between level of complexity and payback time of operational measures

Recommendations for Infrastructure Measures

  • Since AC systems and especially the modern 25kV systems are already energy efficient, the improvement options are rather limited. Because of relatively high effort and investment costs for infrastructure measures, payback times would be far too long, if the measures would be implemented for energy efficiency reasons only.
  • Nevertheless, it makes sense to include potential energy savings in the LCC assessment of upgrading measures for the catenary or for the dimensioning of new AC supply systems. Under specific conditions the reduction of the overhead line impedance by means of additional wires, bigger cross sections or alternative materials can pay off in the long run if a higher capacity of the line is either actually needed or at least anticipated in the near future.

Recommendations for Rolling Stock Measures

  • The developed TecRec 100_001 "Specification and verification of energy consumption for railway rolling stock" should be used for all new projects as a basis for the evaluation of the energy performance of new technologies or design options.
  • Motor flux management is a very promising efficiency technology with a saving potential at system level between 2% and 4%. Since it can be mostly done by software changes only or by minor hardware changes, it is very profitable and has a low payback time. The related energy savings are.
  • Equally promising is the energy management of auxiliaries (MV load management). Investment costs and complexity of changes are comparably low resulting in short payback times. Saving potential are between 2 and 6%.
  • Medium frequency energy distribution is an interesting technology to follow. It has an energy saving potential between 1% and 6%. Investment costs are relatively high and some open questions (e.g. integration) still have to be solved.
  • Most of the promising efficiency technologies mentioned above can be applied also during refits for existing rolling stock. Examples are motor flux management and management of auxiliaries. Since they are highly profitable and have short payback times, they can be also applied to rolling stock with a shorter remaining life time.

The following figure gives an overview over the qualitative dependence of level of complexity and pay-back time for promising AC efficiency technologies:


Qualitative dependence between level of complexity and payback time of AC efficiency technologies