In Railenergy all technologies and operational measures investigated are evaluated on system level. This means that energy saving potential is evaluated at the commonly agreed system boundaries with the measurement point at the "Point of Common Coupling" for electric railways and the diesel fuel tank for diesel powered railways.

For AC 15kV systems with separate high voltage grid for railways (like in Germany, Austria, Switzerland etc.) the "Point of Common Coupling" is defined as the inlet of the substation feeding directly the railway grid and overhead catenary lines with 15kV.

The energy saving potentials are tested by using simulations performed on selected lines and operation – so called demonstration scenes and use cases – by commercial multi-train simulation tools used in a harmonised and transparent way.

The energy simulations are measured in Railenergy KPI’s. Simulation results are reported in percent for the selected KPI 1 and 2 to focus on the technical performance only. The simulations are performed on three levels where the two highest are real multi train simulations on system or subsystem level and the third is based on quantitative estimations based on expertise and experience. The simulations on level 1 contain a baseline scenario and a number of new technology simulations.

The Baseline Scenario (Railenergy Performance Baseline) that has been drawn in terms of the current values of the KPI achieved (or estimated to be achieved) by the concerned players, will be used to assess the improvements in terms of energy efficiency performance that can be achieved by applying the Railenergy technologies to the railway system, as a comparison with current performance.

In details for the Baseline scenario:

  • Input data – information about Railway Infrastructure, Rolling Stock, Technology, framework and Use Cases (selected railway systems).
  • Simulation tool – Multi-train simulators (Sidytrac, Elbas, ECOtrans and Fabel)
  • Output KPIs – results calculated in KPIs (as defined in the WP 1.4) coming from simulators

The New Technology Application scenario is the simulation, in the Use Cases, of the new technologies defined in the Technology Matrix for the assessment of the energy efficiency improvements that can be achieved by applying the Railenergy technologies to the railway system.

In details for the New Technologies Application scenario:

  • Input data – information about Railway Infrastructure, Rolling Stock, Technology , framework and Use Cases (selected railway systems)
  • New Technology data – information about the new technologies application selected.
  • Simulation tool – Multi-train simulators (Sidytrac, Elbas, ECOtrans and Fabel)
  • Output KPIs – results calculated in KPIs (as defined in the WP 1.4) coming from the simulations of Use Cases with the new technologies

Examples of simulation results: