Railenergy

Operational Evaluation

The Railenergy assessment methodology is a generally accepted and applied approach developed within the Railenergy project. Read more here (Railenergy methodology): The Railenergy technology assessment framework and methodology consists of transparent assessments at three levels: technical, operational and strategic level.

At the operational level the energy savings of the different technologies’ have been simulated. The energy simulations are performed on selected lines and operation (so called demo scenes and use cases) by commercial multi-train simulation tools used in a harmonised and transparent way, the so-called global modelling methodology. The energy saving potential is measured in Railenergy Key Performance Indicators (KPI’s) defined in the first phase of the project. The simulation results are described in evaluation reports per use case or service type.

The interpretation and transfer of realistic energy saving potentials from the actual performed simulations in the use cases to other combinations of service types and energy supply types has been done by experts and stored in Technology Potential Tables (TPT) for each technology showing the characteristics of savings.

On the first level, evaluation of the change in energy consumption has been based on the use case system simulations and operational experience. On level 2, evaluated difference in energy consumption has been based on subsystem or component simulation and on level 3 component assessment/expert judgement and operational experience. The simulations results have also been discussed and confirmed at workshops with representatives from the industry.