Railenergy

Demonstration Scenes

The Railenergy consortium, together with the EC, decided to demonstrate the saving potentials of the Railenergy technologies by using different scenarios. The purpose is to show the energy saving potentials in all types of traffic and for all types of energy supply.

A demonstration scene is a collection of use cases. It specifies a particular grouping of technical and operational data representing an essential and typical part of European railway traffic. Each use case is a subset of framework parameters and represents a fixed topography, railway technology and operation.

The following three demonstration scenes have been selected in order to cover different types of services and traffic on European level:

The selected use cases are simplified. For example, only one type of rolling stock has been selected in order to get a homogeneous traffic. Also the timetable was simplified but is still realistic.
Simulations of realistic driving are difficult - the simulation programs are typically designed to run the train in "All-out" mode. Simulations of eco-driving and parked train management in general are not very reliable compared to realistic operational conditions.
Infrastructure has been simulated as realistically as possible.

Demonstration scene 1: Passenger traffic in international routes

Demonstration scene 1 represents passenger traffic in international routes. The selected line is special due to the hilly configuration and the presence of mountains, at least in one part of the demonstration scene. Both on Italian and Austrian side there is a normal profile and a hilly part. As consequence, the hilly profile has impact on the demand for traction power and on the operation.

International route with high speed traffic IM RU Technology type Service type Starting station Border station Country Rolling stock
Use case 1.1 RFF SNCF AC 25 kV (EMU) High Speed Paris Forbach / Sarrebruck France ICE 3
Use case 1.2 DB Netz DB AG AC 15 kV (EMU) High speed Forbach / Sarrebruck Frankfurt Germany ICE 3

Use case 1.1

Use case 1.1. is relevant to high speed service between Paris and Forbach/Sarrenbruck (France). The energy supply type of this line is 2x25 kV AC 50 Hz. It is a RFF line where trains are operated by SNCF. The trains on this line are high speed passenger trains – EMU’s (Electric Multiple Units), Siemens ICE 3.

Only one type of rolling stock (ICE3) has been simulated, although other types of rolling stock are running on the same line.
Infrastructure on the French side is the state of the art technology which is not representative for European high speed line infrastructure configuration.


Rolling stock ICE 3

Use case 1.2

Use case 1.2 represents the German line from Forbach/Sarrenbruck to Frankfurt. The selected rolling stock is the ICE3. The energy supply type of this line is 15 kV AC 16 2/3 Hz. The infrastructure manager of this line is DB Netz, the operator DB AG.

Only one type of rolling stock (ICE3) has been simulated, although other types of rolling stock are running on the same line.

The Germany infrastructure for this use case is not a real high speed line, but it is typical for high speed operations in the conventional rail network. Thus, this use case is quite representative for the European situation.

Demonstration scene 2: International route with mixed traffic

Demonstration scene 2 is dedicated to mixed traffic (passengers and freight) and international services. One country uses AC traction, the other one uses DC traction. Domestic freight traffic, as well as long distance passenger traffic scenario, is subset of the whole demonstration scene. The trains are EMU’s (Electric Multiple Units) and locomotive trains.

International route with mixed traffic IM RU Technology type Service type Starting station Border station Country Rolling stock
Use case 2.1 A ÖBB ÖBB Pass AC 15 kV (loco) IC / Long Distance Kufstein Brenner Austria 1216
Pass AC 15 kV (EMU) IC / Long Distance Kufstein Brenner Austria 4024
ICE 4011
Use case 2.1 B ÖBB RCA Freight Loco
AC 15 kV
Shuttle train
(night time)
Kufstein Brenner Austria 1216
Use case 2.1 C ÖBB ÖBB / RCA Pass & Freight
AC 15 kV
IC / Shuttle train Kufstein Brenner Austria 1216, 4024
ICE 4011
Use case 2.2 RFI Trenitalia /
Trenitalia Cargo
Pass & Freight
DC 3 kV
IC / Shuttle train Verona Brennero Italy aa

Use case 2.1 A

The line chosen is located in Austria, from Kufstein to Brenner. This use case is split in the following two different technology types:

  • Passenger AC (locomotive); the service type is IC/Long distance train, the rolling stock used is 1216.
  • Passenger AC (EMU): the service type is IC/Long distance train. Two kinds of services of EMU AC are available on the Austrian Brenner Line between Kufstein and Brenner:
  • - EMU AC TALENT 4024 from Kufstein to Brenner
  • - EMU AC ICE 4011 (High Speed) from Kufstein to Innsbruck, EMU AC TALENT 4024 from Innsbruck to Brenner

The rolling stocks selected for this use case (see above) are not the only ones running on this line.



Rolling stock TALENT 4024


Rolling stock ICE 4011

Use case 2.1 B

This use case is dedicated only to freight (AC) traffic (locomotive). The line chosen is from Kufstein to Brenner (Austria). The service type is shuttle train; the rolling stock used on this line is the 1216.

The selected rolling stock (1216) is not the only one running on this line.


Rolling stock Loco 1216

Use case 2.1 C

This use case is dedicated only to freight (AC) traffic. The line chosen is from Kufstein to Brenner (Austria). The service type is shuttle train; the rolling stock used on this line is the 1216. The trains are EMU’s (Electric Multiple Units) and locomotive trains.

The selected rolling stocks (1216) are not the only ones running on this line.


Graphical representation of the line Kufstein - Brenner

Use case 2.2

The use case 2.2 is dedicated to passenger and freight DC (locomotive). The line of this use case is from Verona to Brennero (Italy). The service type is shuttle train and the used rolling stock is the E 405.


Rolling stock Loco E405

Demonstration scene 3: Regional route with passenger traffic

Demonstration scene 3 is relevant to passenger transport on regional services with frequent stops as well as intercity services. The energy supply type is diesel and electric. The trains are EMU’s (Electric Multiple Units) and DMU's (Diesel Multiple Unit).

Regional route with passenger traffic IM RU Technology type Service type Starting station Border station Country Rolling stock
Use case 3.1 RFF Veolia
Transport
Diesel (DMU) Regional Paimpol Guingamp France Talent class 644
(simulation only)
Guingamp Carhaix
Use case 3.2 BV SL Electric AC 15 kV (EMU) Regional Märsta Södertälje Sweden Alstom Coradia Lirex
(X60)
Use case 3.3 BV NS Electric DC 1,5 kV (EMU) Regional Utrecht Zwolle Netherlands ICM-III + ICM-IV
Use case 3.4 Pro Rail NS Pass DC 1,5 kV (EMU) IC / Long Distance Rotterdam Groningen Netherlands ICM-III + ICM-IV
Use case 3.5 Pro Rail ATOC Pass Diesel (DMU) IC / Long Distance London Sheffield United Kingdom 222 (4 car)

Use case 3.1

This use case concerns regional traffic in France. The regional network consists of 2 parts: a line from Paimpol to Guingamp and a line from Guingamp to Carhaix. The technology type is diesel (DMU) and the rolling stock used is Talent class 644.

This case is not influenced by the other traffic on the same line (because it is diesel).

Use case 3.2

The line chosen for this use case is from Upplands Väsby to Södertälje (Sweden). The rolling stock used is the Alstom Coradia Lirex (X60). The technology type is electric (EMU) AC, 16 2/3.

This use case simulates a suburban area with a lot of homogeneous traffic.

Use case 3.3

This use case is related to regional traffic from Utrecht to Zwolle (Netherlands). The technology type is electric (EMU) DC, 1,5 kV. The rolling stock used on this line is ICM-III + ICM-IV.

The traffic in this use case is heterogeneous and very high.


Rolling stock ICM III


Rolling stock ICM IV

Use case 3.4

The line chosen for this use case is from Rotterdam to Groningen (Netherlands). The technology type is Pass DC (EMU), the rolling stock used on this line is ICM-III + ICM-IV.

The traffic on this line is heterogeneous (a lot of other traffic).


Graphical representation of the line Rotterdam – Groningen

Use case 3.5

This use case considers the line from London to Sheffield (United Kingdom). The service type is IC / Long distance, the technology is passenger diesel (DMU). The rolling stock on this line is a 222 (4 car).

The traffic on this line is heterogeneous (other traffic). Due to diesel there is no impact by other traffic.


Graphical representation of the line London – Sheffield


Rolling stock 222 (4 cars)